patterns > 12 Days of Winter Kits > 12 Days of Winter Kit Collection Series 6
> Snow Globe Stocking
Snow Globe Stocking
A beautiful stocking hanging from the mantle is a quintessential part of holiday season décor in many homes. Whether you fill it with treats or use it just for decoration, the Snow Globe Stocking is a great way to spice up your wintertime knits. A medley of colors in our Deluxe Bulky Superwash yarn is worked in a stranded colorwork pattern on the leg, as well as a contrast heel and toe. Rico Design Creative Bubble is held together with Deluxe Bulky Superwash in some parts of the stocking to introduce an iridescent snowy effect that gave this pattern its namesake.
DIFFICULTY
Intermediate
SIZES
One Size
FINISHED MEASUREMENTS
Circumference: 15”
Leg Length: 11”
Foot Length: 11”
MATERIALS
Universal Yarn Deluxe Bulky Superwash (100% superwash wool; 100g / 106 yds)
901 Rosy Mauve (A) – 1 ball
913 Honey Dew (B) – 1 ball
928 Pulp (C) – 2 balls
Rico Design Creative Bubble (100% polyester; 50g / 98 yds)
013 White Iridescent (D) – 1 ball
Rico Design Creative Bubble Print (100% polyester; 50g / 98 yds)
004 – Fuchsia Mix (E) – 1 ball
Needles: US Size 10.5 (6.5 mm) set of dpns or your preferred ndl for knitting small circumferences or size needed to obtain gauge
US Size 10 (6 mm) set of dpns or your preferred ndl for knitting small circumferences
Notions: Stitch markers, tapestry needle, waste yarn, 1½” pom pom maker, crochet hook (for provisional cast-on)
GAUGE
14 sts x 16 rows = 4” in K1, P1 Rib with yarns A and E held together using larger ndl
14 sts x 18 rows = 4” in Colorwork Patt using larger ndl
14 sts x 16 rows = 4” in Stockinette stitch (St st) with yarns C and D held together using larger ndl
14 sts x 18 rows = 4” in Stockinette stitch (St st) with yarn C using smaller ndl
Save time, check your gauge.
PATTERN NOTES
This stocking is knit in the round from the cuff down. After the cuff, a stranded colorwork pattern is worked on the leg, and an afterthought heel and toe are worked in a contrasting color from the main foot. An I-Cord edging, hanging loop, and tie with pom poms are added during finishing.
570 projects
stashed 414 times
1526 projects
stashed 1552 times
68 projects
stashed 77 times
- First published: November 2022
- Page created: November 15, 2022
- Last updated: January 10, 2023 …
- visits in the last 24 hours
- visitors right now