patterns > Cast On > Cast On, November 2012-January 2013
> Bill's Aran Sweater
Bill's Aran Sweater
The model that appears on page 60 of the Nov-Jan issue of Cast On is done in color #8010 of Cascade 220.
ERRATA:
On page 61 of CAST ON, Nov-Jan 2013 the directions say to work Row 11 of Chart A in the beginning of the row and then work Row 11 of Chart E at the end of the row…Chart E should have been written as Chart F.
On page 63, the second sentence should read CHART E (not F)
On page 62, the second to the last sentence where it mentions CHART C beg on Row 1, THREE TIMES, should be added.
Likewise, on the first sentence on page 63 the same THREE TIMES should be added after CHART C beg on Row 1
You will notice that on Row 2, 24 sts are there for these cables.
But, again, on Row 3, both times that CHART C is mentioned, the THREE TIMES should be added.
ed
BACK AND FRONT Middle of Page 62
Row 22 WS row (Increase Row):
P1, pfb, p1, kfb, k1, pfb , p1, k2, p1tbl, k2, p9, k2, p1tbl, k2, (p1tbl, kl) five times, p2, k2, p1tbl, k2, p1, kfb, (p2, kfb, pfb, kfb,) twice, p2, kfb, p1, k2, p1tbl, WRONG:(k2, kfb, (p2, kfb in next 3 sts) 3 times) ,CORRECT (k1fb twice, (p1, k1fbl) six times, p2, k1fb twice,) p1tbl, k2, p1, kfb, p2, kfb, pfb, kfb, p2, kfb, pfb, kfb, p2, kfb, p1, k2, p1tbl, k2, p2, (k1, p1tbl) five times, k2, p1tbl, k2, p9, k2, p1tbl, k2, p2, kfb k1, p2, kfb, k2 (175 stitches)
SLEEVES Bottom left of page 63
Cast on 59…NOT 58
Lower middle column of page 63….Row 2 as listed was written backwards…here is the CORRECT copy:
Sleeve second row correct:
R2 (WS): k3, p2, k2, p tbl, k2, p1, k1, p2, k1, p1, k2, p tbl, k3, p2, k3, p2, k3, p2, k3, p tbl, k2, p1, k1, p2, k1, p1, k2, p tbl, k2, p2, k3, p3
Row 22 (WS) Increase row: (Last sentence of middle column on page 63)
K1fb, k2, p1, p1fb k2, p1tbl, k2, p1fb, k1, p2, k1, p1fb, k2, p1tbl, WRONG: k2, k1fb, (p2, k1fb in next 3 sts) 3 times,] CORRECT: k1fb twice, (p1, k1fb) six times,p2, k1fb twice, p1tbl, k2, p1fb, k1, p2, k1, p1fb, k2, p1tbl, k2, p2, k2 3, p3. (75 stitches).
TOP of page 64
Row 1: (RS) K1, beginning with k1, work Seed stich (k1 p1) for 6 NOT 8 stitches, p2, k1tbl, pm, p2, begin with row 1 of Chart C and work 1 multiple, p2 k1tbl, pm, (p4 k4) 3 times, p4 k1tbl, pm, p2, begin with row 1 of Chart C and work 1 multiple, p2, k1tbl, pm, p2, beginning with p1 work Seed stitch until 1 stitch remains, k1.
Row 2: (WS) P1, work in seed stitch (k1, p1,) for 7 not 5 stitches, k2, p1tbl, k2, p8, k2, p1tbl, (k4, p4) 3 times, k4, p1tbl, k2, p8, k2, p1tbl, k2, work in seed stitch until 1 st remain, p1.
On the top of page 63, Row 3 I say work Chart C, work Chart D, then work Chart A It should be C not A!!!!
Chart D: all cable rows are worked on ODD number of rows…all RIGHT SIDE rows… all WS rows are K and P. The notes for C2 over 1left P, C2 over 2 right P, and C2 over 1 P for the WS rows should read: “none defined”.
Sorry!!!!!!
195062 projects
stashed 107170 times
- First published: November 2012
- Page created: November 20, 2012
- Last updated: June 6, 2016 …
- visits in the last 24 hours
- visitors right now