patterns >
Fogbound Knits
> Charlemont








Charlemont
Spend $25 or more in my Ravelry shop in one transaction and you will automatically receive 25% off your entire purchase!
Charlemont is a top-down, seamless, saddle-shouldered pullover designed to flatter, accentuating the shoulders and skimming the body. Its few rows of stranded colorwork - echoed by subtle textured peaks at the hem and sleeves - marry the simple and the striking. Charlemont is a sweater that will take you through the last drips of winter and into spring.
A note about fit: Saddle-shouldered sweaters require a good fit through the shoulders to look their best. Choose a size that is close to your cross-back measurement (measured between the sleeve/body seam across your back).
Skills required:
• Long-tail cast-on
• Backwards-loop cast-on
• Picking up stitches
• Short rows
• Increasing
• Decreasing
• Stranded colorwork (just a few rows!)
Yardage details - (MC/CC1/CC2/CC3):
• XXS - 580/100/100/140
• XS - 625/105/105/150
• S - 670/110/110/155
• M1 - 715/115/115/165
• M2 - 755/120/120/175
• M3 - 800/125/125/185
• M4 - 845/135/135/190
• L - 890/140/140/200
• XL - 935/145/145/210
• XXL - 980/150/150/215
Note: If you are using 220-yard skeins and the chart calls for slightly more than a multiple of 220, you will probably not need that extra skein if you are on gauge and don’t modify the pattern.
Materials:
• You will need needles with cables (or dpns) to accommodate the body, sleeves, and neck
• Needles one size smaller than gauge needles for saddles only
• Needles for neckline and body and sleeve edges that give you gauge in garter stitch (typically 1-2 sizes smaller than what is used for stockinette)
• Stitch markers
• Tape measure
• Waste yarn for holding sleeve stitches
• Tapestry needle for weaving in ends
Sample knit in Cascade 220 in Natural, Doeskin Heather, Smoke Heather, and Chocolate Heather.
207651 projects
stashed
114550 times
107232 projects
stashed
81753 times
59746 projects
stashed
34931 times
85058 projects
stashed
47520 times
55388 projects
stashed
44244 times
- First published: February 2017
- Page created: February 23, 2017
- Last updated: July 2, 2018 …
- visits in the last 24 hours
- visitors right now



